Chain Rules

Only available for you

41 If 17 labourers can dig a ditch 26 m long in 18 days, working 8 hours a day; how many more labourers should be engaged to dig a similar ditch 39 m long in 6 days, each labourer working 9 hours a day ?

A
34
B
51
C
68
D
85

42 20 men complete one-third of a piece of work in 20 days. How many more men should be employed to finish the rest of the work in 25 more days ?

A
10
B
12
C
15
D
20

43 A rope makes 70 rounds of the circumference of a cylinder whose radius of the base is 14 cm. How many times can it go round a cylinder with radius 20 cm ?

A
40
B
49
C
100
D
None of these

44 A contract is to be complete in 46 days and 117 men were set to work, each working 8 hours a day. After 33 days, $$\frac{4}{7}{\text{ }}$$ of the work is completed. How many additional men may be employed so that the work may be completed in time, each man now working 9 hours a day ?

A
80
B
81
C
82
D
83

45 12 persons can do a piece of work in 4 days. How many persons are required to complete 8 times the work in half the time ?

A
144
B
180
C
190
D
192

46 A flagstaff 17.5 m high casts a shadow of length 40.25 m. The height of the building, which casts a shadow of length 28.75 m under similar conditions will be:

A
10 m
B
12.5 m
C
17.5 m
D
21.25 m

47 In a camp, there is a meal for 120 men or 200 children. If 150 children have taken the meal, how many men will be catered to with remaining meal?

A
20
B
30
C
40
D
50

48 An industrial loom weaves 0.128 metres of cloth every second. Approximately, how many seconds will it take for the loom to weave 25 metres of cloth?

A
178
B
195
C
204
D
488

49 36 men can complete a piece of work in 18 days. In how many days will 27 men complete the same work?

A
12
B
18
C
22
D
24

50 4 mat-weavers can weave 4 mats in 4 days. At the same rate, how many mats would be woven by 8 mat-weavers in 8 days?

A
4
B
8
C
12
D
16